Roofers laying new grey slate on a stripped detached house roof under scaffold

New roofs and re-roofing

A new roof, built to last decades.

When repairs stop being worth it, we strip the roof back to the rafters and rebuild it with modern breathable membrane, treated battens and your choice of tile or slate.

4.9 on GoogleFree surveyWritten guaranteeFully insured

A re-roof is the biggest job most homes ever need, and the one where cutting corners shows up later. The difference between a good and bad re-roof is mostly hidden: the membrane, the batten gauge, the fixings, the ventilation and the detail at the edges. We do all of it to current British Standards and photograph each stage so you can see what is under the tiles.

Re-roofing counts as building work, so we notify building control and you get a completion certificate at the end. You will need that certificate when you sell the house.

What's included

  • Scaffolding with edge protection, put up and taken down
  • Strip of old tiles, battens and felt, with all waste removed
  • Checks of every rafter, with any rotten timber replaced
  • New breathable membrane and treated, graded battens
  • New tiles or natural slate, with dry ridge and dry verge systems
  • New lead flashings at the chimney and walls where needed
  • Building control notification and completion certificate
  • Photo record of each stage and a written guarantee

Signs you need it

  • Repairs needed every winter, in different places
  • Tiles that are flaking, crumbling or covered in lichen
  • A sagging or dipping roof line
  • Old bitumen felt that tears when touched in the loft
  • The roof is 50 or more years old and has never been replaced
Breathable membrane and new battens on a stripped roof
Breathable membrane and new battens on a stripped roof
Finished re-roof in red clay tiles on a semi-detached house
Finished re-roof in red clay tiles on a semi-detached house
Roofer fixing slate on a re-roof in Hertfordshire
Roofer fixing slate on a re-roof in Hertfordshire

How the job runs, start to finish

Typical timings. Weather and material deliveries can move things, and we will always tell you if they do.

  1. 01

    Free survey

    We measure up, check the loft and talk through tiles

  2. 02

    Written quote

    Within a few days, itemised

  3. 03

    Scaffold up

    The day before work starts

  4. 04

    Strip and re-roof

    Usually 5 to 10 working days for a house

  5. 05

    Sign-off

    Building control certificate and written guarantee

Roofer fixing tiles on a pitched roof at sunset

Get a price for your new roofs and re-roofing

Answer a few quick questions and see a guide price in under a minute. Or call and talk to a roofer, not a call centre.

4.9 on GoogleFree surveyWritten guaranteeFully insured